Holton Heath Down Main Renewal 19th March 2005


The sixth and final week of engineering works in and around the Wareham area. A selection of pics.



During the last 6 weekend possession's we've had Snow, loads of ice a bit of rain and this weekend fog!
66204 arrives at Poole some 25 minutes down on the 23:05 6Z31 Eastleigh Yard (EHYD) - Poole (PE). This was supposed to depart around 00:30'ish but didn't arrive till 00:40. It finally left about 01:15.This had the Balfour Beatty's New Track Construction Machine behind it as well at the rear was 66022.



On its 3rd visit through Poole for the engineering works 66122 arrives on the 00:05 6Z32 EHYD - PE. This has in tow 5 JNA's 5 Seacow's and an OCA and YWA flat wagon.



66063 arrives at Poole in full fog with the 6Z34 00:56 EHYD - PE.



66096 arrives on the 01:30 6Z35 EHYD - PE. This had a rake of 10 MHA Auto-ballasters.

This page updated:- 12th November 2006
www.Hentis-Rail.com , www.Hentis-Rail.co.uk & Hentis Rail © are copyright 2002 - 2006 Anthony Henley.
All Pictures unless otherwise stated on this web site have been photographed and are Copyright of Anthony Henley
and may not be used without prior permission from me.